The next stage of construction was excavation for the foundations. Black foil was placed in the completed trench to prevent moisture from absorbing into the concrete from the ground. Then, the reinforcement made in accordance with the structural design was placed in the trenches and prepared for pouring concrete.


MAKE.IT.REAL
Al. Jana Pawła II 27
00-867 Warszawa
info@fkproperty.onmicrosoft.com
+48 730 709 372