The facade team continued installing the External Wall Insulation (EWI) to the gable ends of the house. Alongside this, the roofer installed a mesh strip to the underside of the fascia board to allow air flow within the roof space.


MAKE.IT.REAL
Al. Jana Pawła II 27
00-867 Warszawa
info@fkproperty.onmicrosoft.com
+48 730 709 372