Finishing the roof and installing windows and doors were done at the same time.
The roof was covered with seam metal, and the fascia and gutter flashings were attached.
Windows and doors were installed using the technique 'warm installation', which seals the place of mounting the window frame in the building wall. Thermal insulation in this case consists of three layers of sealing, not just an insulating foam underlay.


MAKE.IT.REAL
Al. Jana Pawła II 27
00-867 Warszawa
info@fkproperty.onmicrosoft.com
+48 730 709 372